MachineBuilding
px

Free energy chain inspections for summer shutdowns

27 May 2009

igus (UK) Ltdvisit website

 

Free energy chain inspections for summer shutdownsigus UK is once again inviting maintenance engineers to book a free energy chain and flexible cable annual inspection before or during factory shutdowns scheduled in July and August 2010.

Justin Leonard of igus UK states: "During shutdowns, time is of the essence. If our inspections do flag up a problem, we can ensure that replacement parts are delivered and engineers are at hand during your shutdown. In addition, as we stock our E-Chains and cables at our facility in Northampton, replacement parts can normally be delivered and installed during the same shutdown period."

If you would like to schedule an appointment, please call igus UK directly on +44 (0)1604 677240 or email .

 
© Copyright 2006-14 Damte Ltd.