Plastic energy chains last four times longer than steel
Kronopol has installed Igus E4/4 system series 5050 plastic energy chains on its machines producing timber products; compared with the steel energy chains that had to be replaced every six months, the Igus energy chains have been in operation for over four years without any failures.