Mitsubishi Electric's rapid response saves the day

Mitsubishi Electric's service and support commitment proved its worth at a West Midlands dairy. With downtime estimated at some £3000 per hour, service engineers were able to diagnose a blender problem in double quick time and restore operation to avert a production stoppage.

The price pressures impacting on the dairy industry make unscheduled downtime the enemy of profitability. Against this, there is the ongoing drive to boost productivity by making upgrades to processes and machinery over the lifetime of the equipment, including modifications to PLC programs. In the vast majority of cases, such upgrades go without a hitch but when something goes wrong, it's good to know that you can rely on a fast response from your automation supplier.

Such was the case at one West Midlands dairy, when it was noted that the blending plant was exhibiting some unexplained operation of the valves and showing various valve position feedback alarms. Downtime from any operational failure is never good news and a return to full production was critical. Monitoring the system controlling the process did not reveal anything obviously wrong, but the site engineers knew they had to get the problem resolved as soon as possible and put in a call to the Mitsubishi technical support hotline.

Mitsubishi Electric has a firm commitment to service and technical support, via its System Service Group, providing added value services including 24-hour telephone support and a full complement of authorised engineers to provide everything from routine service to emergency downtime mitigation. The System Service offering supports both current and past generation product lines, with authorised Service Agents providing local engineers at regional centres and key partners providing expert advice and on-the-ground repairs.

Mitsubishi can also offer service support for other vendor's automation equipment, providing a "one stop shop" and peace of mind.

The Mitsubishi technical support line took the call, evaluated the problem and contacted Mitsubishi Electric's Service Agent NISCAM. Service engineer Carl Chadwick received the call, contacted the customer and took as much detail as possible. Then set off on the 33-mile journey to the plant, knowing that time was of the essence.

Routine health check

Mitsubishi Electric products are very reliable and it is not uncommon to find examples of PLCs still in continuous operation after 20 or more years of service. So, finding nothing wrong with the PLC itself as expected, Carl singled out one of the troublesome valves and started a code trace of the valve control logic. It was found that there was a request to open the valve but no output to the open solenoid. The logic was checked against an earlier backup taken 3 months earlier during a routine health check as part of the customer's "Mitsubishi 3 Diamond Service Contract" and key differences were found.

The site laptop was checked and found to have two versions of the program saved. One was fully commented, looking very much like the original post-commissioning work and a second, later version.

Comparing these two programs with the one loaded in the PLC, Carl quickly identified differences surrounding the valve control logic. It then emerged that modifications had been made by one of the dairy's site engineers the previous Friday as part of ongoing efforts to improve productivity. Carl's suspicion was that the valve control modification had been implemented but with a very slight error. Carl noted the changes then re-loaded the program and after testing found that the valves were now operating correctly, with no positional errors shown. Carl stayed on site for a further 30 minutes whilst the process was started, to ensure all valves operated and the process sequence was stable. Finally, he saved the program as the latest version, and retained a copy for the Mitsubishi archive system.

This cautionary tale of course highlights the importance of effective program management, fully commented documentation and regular backups, as part of a customised Diamond Service Contract. The problem would have been difficult and time consuming to diagnose but for the fact that Carl already had an archived backup against which to compare the incorrect program running in the PLC.

Perhaps more importantly it demonstrates Mitsubishi Electric's commitment to service and support. With downtime costing the Dairy an estimated £3000 per hour, Mitsubishi's ability to provide local engineering support to expedite a return to normal functionality certainly helped to save the day.

For further information about Mitsubishi's service and technical support, please visit automation.mitsubishielectric.co.uk.

Mitsubishi Electric Europe B.V.

Travellers Lane
Hatfield
AL10 8XB
UNITED KINGDOM

+44 (0)1707 288780

automation@meuk.mee.com

https://gb3a.mitsubishielectric.com

More applications
4 hours ago
Farnell, NXP and Doulos present new Industry 4.0 webinar
Farnell has announced the launch a new global webinar covering ‘Automation and Edge AI for Industry 4.0’ in partnership with the Element14 Community, NXP and Doulos on Wednesday 24 August.
8 hours ago
Thorite offers same-day hydraulic hose assembly service
Air and fluid power specialist Thorite has launched a same-day hydraulic hose assembly service to help customers reduce downtime and control costs.
12 hours ago
Actuator increases accuracy and productivity of bagging machine
When end users of a precision bagging machine started using economical bags with inconsistent sizes, this impacted accuracy and productivity of the bulk bagging process.
1 day ago
World’s first e-chain made of 100% recycled material
Conserving resources and extending the product life cycle are the objectives of the new Igus cradle-chain E2.1.CG, which the company says saves 28% CO2 versus current e-chain production.
1 day ago
Siemens Congleton factory accelerates towards net zero goal
Siemens’ Congleton factory is on track to achieve carbon neutrality this year – eight years ahead of its original target.
1 day ago
Inductive sensors prove a ‘jack of all trades’ in bridge construction
When a specialist assembler of prefabricated bridges needed a rugged sensor for position sensing on its hydraulic cylinders, it turned to Contrinex.
1 day ago
Digital tools to support engineering design
Nowadays in engineering, digital tools are an essential part of a design engineer’s daily life and any tools that are available freely are naturally an added bonus.
2 days ago
Nabtesco delivers solutions for every drive application
To continue meeting increasing demand, Nabtesco is substantially expanding its production capacities with the construction of a new factory in Hamamatsu, 250 km southwest of the its headquarters in Tokyo – which will double the annual production capacity to two million precision gearboxes by 2026.
3 days ago
Festo showing ‘Progress in Motion’ at PPMA 2022
The Festo stand at PPMA 2022 will focus on key applications for the process and packaging sector. These include innovative process valve controls, servo-controlled flow wrapping and a new solution for controlling web tension with dancing rollers.
3 days ago
IFM Electronic makes IIoT easy at PPMA 2022
At this year’s PPMA Show, IFM Electronic is focusing on its moneo IIoT platform. This has been developed specifically to provide a convenient solution to the challenge of converting the huge amount of data produced by modern plant and machines into useful information that can be used to reduce downtime, optimise efficiency and cut costs.

Login / Sign up