Screw jacks meet the needs of nuclear waste plant
Posted to News on 29th May 2009, 23:05

Screw jacks meet the needs of nuclear waste plant

Power Jacks' stainless steel screw jacks were deemed to be the best such products available for an application at the Dounreay nuclear waste reprocessing plant due to their high reliability, good control characteristics and low maintenance.

Screw jacks meet the needs of nuclear waste plant


Follow the link to read about this application story.

Alternatively, find out more and download literature for Power Jacks' extensive range of screw jacks.


Power Jacks Ltd

Balmacassie Commercial Park
AB41 8BX
UNITED KINGDOM

+44 (0)1224 968 968

Pilz Automation Ltd ABSSAC Ltd Mechan Controls Ltd SICK (UK) LTD Lenze Selection (a Division of Lenze Ltd) Matara UK Ltd Spelsberg Els UK Ltd AutomateUK Servo Components & Systems Ltd maxon Group Rittal Ltd Smartscan Ltd FATH Components Ltd Aerotech Ltd Lenze Selection (a Division of Lenze Ltd) Procter Machine Safety STOBER Drives Ltd Phoenix Contact Ltd Leuze electronic Ltd Heidenhain (GB) Ltd PI (Physik Instrumente) Ltd Top Hex Ltd Moore International Ltd Kawasaki Robotics (UK) Ltd Pilz Automation Ltd AutomateUK Euchner (UK) Machinesafe Compliance Ltd Murrelektronik Ltd HARTING Ltd Dold Industries Ltd