The CuMaster from BOSCHERT is a highly dynamic, high-precision copper punching machine that processes long copper, aluminium and steel bars. The machine manufacturer relies on right-angle planetary gearboxes and right-angle servo gearboxes from STOBER, as well as on the drive specialist's new rack and pinion drives.
26th March 2026
Hanover Displays, a UK-based manufacturer of passenger information systems for the public transport sector, has reached a major manufacturing milestone: the completion of its 1,000,000th automated quality test of printed circuit boards (PCBs) using Techman collaborative robots from LG Motion.
26th March 2026
Servo drives, motors and PLCs from Inovance have enabled packaging machinery OEM Spiraltech to automate a machine capable of cutting cardboard cores from 60 mm up to 1,250 mm in diameter.
25th March 2026
Automation solutions provider Eberle Automatische Systeme has developed a breakthrough in quality control with a focus on the cheese-ripening process, combining AI with machine vision software from MVTec.
17th March 2026
Precision planetary gearboxes from Apex Dynamics have been selected by UK packaging machinery company T. Freemantle for use in its new S01 pre-glued sleever.
11th March 2026
Cameras from IDS Imaging Development Systems are at the heart of a new, automated system in Germany that enables intelligent sorting of used textiles.
9th March 2026
In many production environments, cleaning processes are run conservatively because cleanliness may be hard to verify. The result is frequent cleaning fluid changes, unnecessary downtime, and higher operating costs, all justified in the name of risk reduction. Hydraulic cylinder manufacturer Burnside Hydracyl worked with Dyne Testing, an Intertronics brand, to replace assumption with measurement in its cylinder washing process.
5th March 2026
When in 1998 the Royal Opera House in London needed help with a cable management solution for its lighting trusses, it turned to igus. Some 27 years later as part of refurbishment project, the Royal Opera House engineering team needed another novel solution: an energy supply system that had to meet new requirements in terms of load, smooth running and weight. igus was happy to help out again.
27th February 2026